Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Calculations are based on the below logic :


• Start/End dates of the Sprint are taken in consideration
• Then the capacity of the resource(s) defined in the template is taken
• The Focus value of each resource is also taken into account. For eg if Focus is 0.5 and capacity is 8hrs
per day, then it is assumed that the resource will spend 8 * 0.5 = 4hrs per day in the sprint
• Non working day as setup in team settings (for example Saturday/Sunday) are removed
• Any team holiday(s) are removed

As per above parameters, the app scans through all the issues in the Sprint and which issues are assigned to each resource.

The app then calculates the total duration for the sprint, the time spent by each resource on the assigned issues and checks the attached capacity template to calculate the allocated hours and remaining capacity.

  • No labels