...
Time in Status Per Time Grain - You can compare status times over a historic duration and take actions if the time in status are not improving.
Time with Assignee - Total time, the issue was with each Assignee
...
...
Time in Status Per Time Grain - You can compare status times over a historic duration and take actions if the time in status are not improving.
Time with Assignee - Total time, the issue was with each Assignee
...